Description
High-voltage DC contactor datasheet for EV, battery, charging, photovoltaic and energy-storage switching applications. Values and diagrams are extracted from the source engineering PDF; confirm final load profile, coil option and terminal form before ordering.
Online sample checkout is enabled at USD 30.00 per unit. Submit RFQ for production pricing, quantity breaks and final engineering confirmation.

Contact / Load Data
| Contact Form | 1 Form A |
|---|---|
| Contact Rated Load | 400 A |
| Max Switching Voltage | 1000 VDC |
| Max Breaking Current | 2500A(320V DC) 1 times |
| Current Tolerance | 600A: 20min;1200A: 30s;3000A: 0.6s |
| Contact Resistance | <=1@20A |
| Mechanical Durability | 3×105 |
Relay Performance
| Operating Time | 30Max. |
|---|---|
| Release Time | 10Max. |
| Insulation Resistance | 1000 (1000VDC) |
| Open Contact Dielectric | 3000VAC 50 Hz/60 Hz |
| Contact/Coil Dielectric | 4000VAC 50 Hz/60 Hz |
| Electrical Endurance | 400A 450VDC (DC-1) |
Coil Options
| 12V DC | range ±20%Us; pickup 9Vmax; dropout (2-5)V; power When switched on:45W, When holding:3.8W |
|---|---|
| 24V DC | range ±20%Us; pickup 18Vmax; dropout (3-9)V; power When switched on: 45W, When holding: 3.8W |
Environment / Mechanical
| Operating Temperature | -40-+85 |
|---|---|
| Humidity | 5%-85%RH |
| Vibration | 10Hz-500Hz 49 m/s2 |
| Impact Stability | 196m/s2 |
| Impact Strength | 490 m/s2 |
| Weight | 700 g |
Ordering support
EVM-400 — High Voltage DC Contactor source family datasheet
Source: High Voltage DC Contactor EVM-400 Ceramic Series.pdf. RoHS, custom terminal, coil and auxiliary-contact options should be confirmed against the latest factory datasheet and project requirements.