High Voltage DC Contactors
Browse SHR AUTOSENSOR relay, contactor, and sensor series. For pricing, samples, or cross-reference support, send your specifications.
High Voltage DC Contactors application and selection guide
High voltage DC contactors are designed for DC load control in battery, EV, charging, energy storage and industrial power systems where carry, make and break ratings must be matched to voltage, load type, polarity and pre-charge strategy.
Use this family for DC power-path control where arc suppression, contact life, coil control and thermal design must be confirmed against the real load profile.

Key selection parameters
- Application voltage
- High-voltage DC platform; model-specific rating by datasheet
- Current range
- Model-specific continuous and making/breaking current
- Coil voltage
- 12V / 24V / custom options depending on series
- Auxiliary contact
- Available on selected models for state feedback
- Mounting
- Panel, chassis or busbar integration depending on model
Before choosing a model
These notes keep product pages useful for engineers while avoiding overclaims. Final ratings remain model- and application-specific.
High voltage DC contactor selection comparison
Start with system voltage, continuous current, load type and coil/control requirements. Final make/break ratings must be confirmed by model datasheet and RFQ.
| Selection item | Typical options | Why it matters | RFQ confirmation |
|---|---|---|---|
| DC platform voltage | Battery / charger / ESS high-voltage bus | Determines insulation, arc suppression and safety margin | Working voltage, maximum voltage and transient profile |
| Current class | Model-specific continuous and switching current | Controls thermal design and contact life | Continuous current, breaking current and duty cycle |
| Coil / control | 12V / 24V / custom coil families | Must match BMS, charger or PLC control circuit | Coil voltage, economizer need and auxiliary contact |
| Mounting | Panel, chassis, busbar or cable integration | Affects heat, vibration and serviceability | Drawing, terminal type and installation orientation |
Representative models in this family
Each model links to its own detail page and datasheet/RFQ path. Use the All Models index for the complete list.
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
- Application voltage: High-voltage DC platform; model-specific rating by datasheet
- Current range: Model-specific continuous and making/breaking current
- Coil voltage: 12V / 24V / custom options depending on series
- Auxiliary contact: Available on selected models for state feedback
High Voltage DC Contactors selection FAQ
Answers are shown on-page to match the structured FAQ data and help engineers prepare datasheet review or RFQ requests.
How do I choose a High Voltage DC Contactors model?
Start from the application requirement, then compare Application voltage, Current range, Coil voltage, Auxiliary contact, Mounting. Open the model detail page and PDF datasheet before confirming the final ordering code.
Where can I find individual datasheets for this product family?
Each representative model card links to its own detail page and PDF datasheet. For production projects, submit an RFQ so voltage, current, mounting and compliance requirements can be confirmed.
What information should be included in an RFQ?
Include working voltage, current, load type, contact or output form, coil or control voltage, mounting style, environment, validation quantity and expected production volume.
High voltage DC contactor selection details
Select DC contactors by continuous current, DC bus voltage, making/breaking duty, coil/control voltage, auxiliary contact, terminal style, sealing type and thermal environment.

Selection checklist
- Continuous current and short-time withstand
- DC voltage, load type and breaking duty
- Epoxy sealed EVI vs ceramic sealed EVM
- Coil voltage, economizer and auxiliary contact
- Busbar terminal spacing and mounting hole pattern
- Application: EV, ESS, PV inverter, DC charger
Representative models
Use these models as starting points when comparing voltage, current, contact form, package and application duty.
Model code example: EVM-200A-12/24V
- EVM
- Ceramic sealed high-voltage DC contactor family
- 200A
- Nominal current class
- 12/24V
- Coil/control voltage option
- Aux/terminal
- Auxiliary contact, polarity and busbar terminals by drawing
High Voltage DC Contactors English catalog
Review the standardized English product-family catalog, datasheets and RFQ path for this product category.
Download Category Catalog Complete Product Catalog Request Engineering Quote
Original source PDFs are preferred when available. Generated English PDFs are used only when no original source PDF is found; final ratings, drawings and application suitability are confirmed by RFQ.
Refine this product family
Use the selectors to narrow visible Shop categories or product cards. If exact electrical requirements are not clear, send the filter as an RFQ instead.
Showing 28–36 of 40 results
-

EVM-250
$30.00 View / Buy -

EVM-300 High Voltage DC Contactor
$30.00 View / Buy -

EVM-40 High Voltage DC Contactor
$30.00 View / Buy -

EVM-400 High Voltage DC Contactor
$30.00 View / Buy -

EVM100A
$60.00 View / Buy -

EVM200A
$60.00 View / Buy -

EVM400A
$60.00 View / Buy -

EVM40A
$60.00 View / Buy -

EVP-250 High Voltage DC Contactor
View / Buy
Need a datasheet, sample, or cross-reference?
Send your part number, voltage/current, coil voltage, contact form and quantity. Our engineering sales team replies with equivalents, pricing and lead time.