Skip to main content
SHR AUTOSENSOR TECH LIMITED Engineering RFQ Support
Product Catalog

High Voltage DC Contactors

Browse SHR AUTOSENSOR relay, contactor, and sensor series. For pricing, samples, or cross-reference support, send your specifications.

Product family overview

High Voltage DC Contactors application and selection guide

High voltage DC contactors are designed for DC load control in battery, EV, charging, energy storage and industrial power systems where carry, make and break ratings must be matched to voltage, load type, polarity and pre-charge strategy.

Use this family for DC power-path control where arc suppression, contact life, coil control and thermal design must be confirmed against the real load profile.

EV battery disconnect and pre-charge systemsCharging piles and DC fast chargingEnergy storage systemsIndustrial DC power and safety isolation
High Voltage DC Contactor principle illustration
1Battery / DC bus
2Coil drive
3Main contact chamber
4Load / inverter / charger
Main parameters

Key selection parameters

Application voltage
High-voltage DC platform; model-specific rating by datasheet
Current range
Model-specific continuous and making/breaking current
Coil voltage
12V / 24V / custom options depending on series
Auxiliary contact
Available on selected models for state feedback
Mounting
Panel, chassis or busbar integration depending on model
Engineering selection notes

Before choosing a model

These notes keep product pages useful for engineers while avoiding overclaims. Final ratings remain model- and application-specific.

Carry current is not make/break currentContinuous current, making current and breaking current depend on DC voltage, time constant, polarity, pre-charge strategy and expected electrical life. Use the datasheet limits and RFQ review for the real load profile.
Pre-charge and polarity matterDC-link capacitors usually need a pre-charge path. Many DC contactors are polarity-sensitive for interruption, so bidirectional or reverse-current systems require explicit confirmation.
Follow coil suppression instructionsDo not add external flyback diodes or suppression to internally economized/suppressed contactor coils unless the contactor datasheet approves it; delayed release can reduce interrupt capability.
Series comparison

High voltage DC contactor selection comparison

Start with system voltage, continuous current, load type and coil/control requirements. Final make/break ratings must be confirmed by model datasheet and RFQ.

Selection itemTypical optionsWhy it mattersRFQ confirmation
DC platform voltageBattery / charger / ESS high-voltage busDetermines insulation, arc suppression and safety marginWorking voltage, maximum voltage and transient profile
Current classModel-specific continuous and switching currentControls thermal design and contact lifeContinuous current, breaking current and duty cycle
Coil / control12V / 24V / custom coil familiesMust match BMS, charger or PLC control circuitCoil voltage, economizer need and auxiliary contact
MountingPanel, chassis, busbar or cable integrationAffects heat, vibration and serviceabilityDrawing, terminal type and installation orientation
Model display

Representative models in this family

Each model links to its own detail page and datasheet/RFQ path. Use the All Models index for the complete list.

ESM-150ESM-150 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

ESM-20ESM-20 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

ESM-250ESM-250 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

ESM-350ESM-350 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

ESM-400ESM-400 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

ESM-600ESM-600 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

ESM-800ESM-800 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

EVG-150EVG-150 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

EVG-200EVG-200 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

EVG-250EVG-250 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

EVG-300EVG-300 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

EVG-350EVG-350 High Voltage DC Contactor
  • Application voltage: High-voltage DC platform; model-specific rating by datasheet
  • Current range: Model-specific continuous and making/breaking current
  • Coil voltage: 12V / 24V / custom options depending on series
  • Auxiliary contact: Available on selected models for state feedback

Details · Datasheet

View complete model index

FAQ

High Voltage DC Contactors selection FAQ

Answers are shown on-page to match the structured FAQ data and help engineers prepare datasheet review or RFQ requests.

How do I choose a High Voltage DC Contactors model?

Start from the application requirement, then compare Application voltage, Current range, Coil voltage, Auxiliary contact, Mounting. Open the model detail page and PDF datasheet before confirming the final ordering code.

Where can I find individual datasheets for this product family?

Each representative model card links to its own detail page and PDF datasheet. For production projects, submit an RFQ so voltage, current, mounting and compliance requirements can be confirmed.

What information should be included in an RFQ?

Include working voltage, current, load type, contact or output form, coil or control voltage, mounting style, environment, validation quantity and expected production volume.

Engineering selection guide

High voltage DC contactor selection details

Select DC contactors by continuous current, DC bus voltage, making/breaking duty, coil/control voltage, auxiliary contact, terminal style, sealing type and thermal environment.

High voltage DC contactor selection details product reference image
Representative product image; exact package and marking vary by model.

Selection checklist

  • Continuous current and short-time withstand
  • DC voltage, load type and breaking duty
  • Epoxy sealed EVI vs ceramic sealed EVM
  • Coil voltage, economizer and auxiliary contact
  • Busbar terminal spacing and mounting hole pattern
  • Application: EV, ESS, PV inverter, DC charger

Model code example: EVM-200A-12/24V

EVM
Ceramic sealed high-voltage DC contactor family
200A
Nominal current class
12/24V
Coil/control voltage option
Aux/terminal
Auxiliary contact, polarity and busbar terminals by drawing
English engineering resources

High Voltage DC Contactors English catalog

Review the standardized English product-family catalog, datasheets and RFQ path for this product category.

Download Category Catalog Complete Product Catalog Request Engineering Quote

Original source PDFs are preferred when available. Generated English PDFs are used only when no original source PDF is found; final ratings, drawings and application suitability are confirmed by RFQ.

Engineering Filter

Refine this product family

Use the selectors to narrow visible Shop categories or product cards. If exact electrical requirements are not clear, send the filter as an RFQ instead.

Send Filter as RFQ

Showing 19–27 of 40 results

Work with an engineer

Need a datasheet, sample, or cross-reference?

Send your part number, voltage/current, coil voltage, contact form and quantity. Our engineering sales team replies with equivalents, pricing and lead time.

WhatsApp Request a Quote